Features:
- Satin, spear point blade made of 7Cr17MoV steel.
- Nail nick opener.
- Black G-10 handle with stainless steel hardware.
- Tip-down pocket clip for secure carry.
Description:
The Long Lead EDC pocket knife from Boker Magnum is an attractive, modern slip joint knife that is great for everyday use. The knife has a sleek, classy appearance and will slide comfortably into your pocket with the tip-down pocket clip, ready to meet your cutting needs.
If you are looking for affordable, interesting designs, be sure to check out more of our
Boker Magnum folding knives.












![Boker Strike Auto Knife, CPM-S30V Stonewash Blade [Exclusive]](https://www.budgetbokerknives.com/wp-content/uploads/2025/11/BO01BO455N-2__26902.1628173622-247x247.webp)




Reviews
There are no reviews yet.